Pool Opening Checklist: Everything You Need to Get Your Pool Ready

Don't let pool opening day catch you off guard. Use this checklist to make sure you have everything you need before you get started.

Equipment Checklist

Chemical Checklist

Step-by-Step Opening Order

  1. Remove, clean, and store your winter cover
  2. Reconnect all equipment and inspect for damage
  3. Fill pool to proper water level (mid-skimmer)
  4. Start pump and circulate water for 24 hours
  5. Test water chemistry
  6. Adjust pH and alkalinity first, then add stabilizer
  7. Shock the pool and run pump overnight
  8. Add algaecide as a preventive measure
  9. Test again after 24 hours and fine-tune

Pro Tip: Always add chemicals one at a time with the pump running, and wait at least 15–30 minutes between additions. Never mix chemicals together before adding them to the pool.

Bookmark this checklist and you'll never miss a step!